More than 60 trees were moved to a safe heeling-in site by Opitz international specialists in November 2008 as part of the redesign project at the Inselbad prior to the start of the actual construction work to protect the trees from damage during the reconstruction phase. However, the redesign of the surroundings could be started earlier without having to consider the well-being of the valuable shade trees.
The pools, grandstands, technical building and changing rooms underwent a massive redesign over the following 12 months. The landscaping project started in November 2009. The first trees (including maple, lime and hornbeam) were moved to their new locations with the Optimal 2500 and maintained in accordance with professional standards.
In May 2010, the time had come: The new Inselbad the re-opened to the eager bathers of Eichstätt.